Timeline of a Bathroom Renovation Project

So you have decided to renovate your bathroom, that’s great! Not only will you be able to design it to be both perfectly functional and equally stunning for you and your family, but you will also be learning new skills and boosting your home’s value! Before you get started, though, there is a timeline you should consider for your bathroom renovation. Remember that the entire process, from replacing the flooring to painting the walls, will take time. Make sure that you have an alternative while your bathroom renovation is being done, or you could find yourself in a pretty unpleasant situation! Read on for more tips on renovating your bathroom that will help you plan for the time involved while still getting you that updated washroom as quickly as possible!

Bathroom Renovation Ideas

Bathroom renovation is very rewarding, but since every renovation idea is different, you will need to consider the various improvements you’re planning on doing and how complex they will be. The more complicated the improvement, the longer it will end up taking. Not only that but your time spent planning needs to be considered as well. If you are getting any plumbing upgraded you obviously need to take into account its completion in regards to your timeline, but what about how it fits into your bathroom renovation schedule as a whole? 

Timeline of a Bathroom Renovation Project Template

Step 1: Planning (Duration: 1 - 2 weeks)

Just like any successful project, a well-thought-through plan is vital for your bathroom renovation. Make it a priority to plan out what you want installed and upgraded first, and then what will follow after that. This will help with purchasing bathroom renovation items and with the actual work you’ll be doing. Planning this out well could take up to 1-2 weeks, so add that to your timeline first.

During this stage, you’ll want to:

  1. Identify the Objective: Are you remodelling your entire bathroom or simply changing a few fixtures? Are you aiming for a refreshed aesthetic, improved functionality, or both?
  2. Create a Budget: Consider the bathroom renovation cost of materials, labour, and unexpected expenses.
  3. Design Your Vision: Plan the overall look and feel of your renovated bathroom. Invest time in researching current trends, desired materials, and practical considerations.
  4. Hire a Contractor: If you’re not planning a DIY project, it’s crucial to hire a reliable painting contractor.

Step 2: Procurement of Materials (Duration: 1- 7 weeks)

Once you’ve finalized your design, it’s time to promptly procure all necessary renovation materials.

Your contractor should provide you with a comprehensive list of required items, from tiles and fixtures to cabinetry and lighting. Purchasing these items ahead of time will help prevent unnecessary delays once the renovation begins.

In terms of actually gathering all the materials you will need, the reality is that you likely won’t be picking everything up at the store. There are some items you will be ordering online or at the retailer itself, and delivery can take anywhere from 1-7 weeks. In some cases, it will be even longer, so try to get this done early to keep your timeline as short as possible.

Step 3: Demolition (Duration: 2 - 3 days)

Out with the old and in with the new! This stage involves tearing out your old bathroom fixtures, flooring, and sometimes even walls, to create a blank canvas for your new design.

Don’t forget: Safety should be your utmost priority during this phase.

Step 4: Plumbing and Electrical Rough-In (Duration: 1-2 weeks)

This involves installing the basic electrical and plumbing systems without the final connections. Professionals should carry out these tasks to ensure safety and regulatory compliance.

Step 5: Installation (Duration: 1-2 weeks)

Installing new fixtures, cabinetry, and flooring transforms your space and brings your vision to life.

  1. Subfloor and Drywall Installation: This creates the structure for your tiles or whatever flooring you have chosen.
  2. Installation of New Fixtures and Fittings: This includes the bath, shower, toilet, and sink.
  3. Cabinetry and Countertop Installation: These are installed next, followed by mirrors, towel racks, and other accessories.
  4. Final Plumbing and Electrical Connections: This will be carried out to get all fixtures properly working.

Step 6: Finishing Touches (Duration: 2 - 5 days)

Of course, after everything has been installed and painted, you’ll want to add your own finishing touches with a bit of decor or slight touch-ups. After all, you want your bathroom to be perfect and just the way you want it! This may take another 2-5 days on its own.

This is where you can finally see your plan coming together. Paint walls, install light fixtures, place the vanity units, and put in other remaining items according to your design.

Step 7: Clean Up and Final Inspection (Duration: 1 - 2 days)

Following the completion of the work, there will be a cleanup phase. A final walkthrough will be done to ensure all tasks have been completed to your satisfaction.

Once you’ve completely finished the bathroom, you’re bound to feel delighted every time you step inside! It may have taken you a long time to get to where you are, but it’s better to spend the days and weeks doing something properly than rushing it and being unhappy with the finished product. Congratulations on accomplishing your bathroom renovation!

In Summary:

If you are hiring professionals for your bathroom renovation, that does not mean everything will be done in a single day. The amount of time it will take will vary depending on the work being done. Try not to get too frustrated, as hiring professionals means that bathroom renovation contractors will get it done much faster than you could have done it, and do it very well. As a whole, this may take up to 2-4 weeks, but it’s well worth the wait.

If you choose to do it yourself, depending on the amount of knowledge and experience you currently have, it might take you months to finish the work. This is because the average person has a full-time job, and getting your bathroom renovation done on weekends and evenings doesn’t leave you with much time. That doesn’t even take into account the many other commitments you probably have.

Bathroom Renovation Before and After

Bathroom Before And After
Bathroom Before And After
Bathroom Before And After
Bathroom Before And After

More TESTIMONIALS Related to
Timeline of a Bathroom Renovation Project

Now that you understand the timeline for bathroom renovation projects, you should be able to tackle this without any surprises. Major renovations such as these take a lot of time and patience, so be sure you can handle surrendering that space in the meantime. If you would like to speed up the process of renovating your bathroom, why not have Home Painters Toronto paint it for you? Give Home Painters Toronto a call today at 416.494.9095 or email us at Brian@HomePaintersToronto.com. And don’t forget to follow us on all our social channels below!